System Online
|60 DERs Connected
21
Not signed in
Fleet

Phoenix Pumped Hydro

Central Tablelands, New South Wales · 800 MW · commissioned 2028 · ACEN — Hydro

PARTIAL
Grid Interface
Reactive power
67.2 MVAr
capacitive (voltage support)
Power factor
0.970
meets grid code
Available capacity
752.0 MW
472.0 MW headroom
Dispatch state
Curtailed
63% below capability
Asset Overview
Location
New South Wales
Central Tablelands, New South Wales
Nameplate
800 MW
Current output
280 MW
35% of rated
Capacity factor
25%
Net head
639.2 m
680 m gross
Reservoir level
617.6 MASL
72% of band
Turbine flow
49.6 m³/s
141.8 m³/s design
Hydro type
reservoir
4 units
Spill flow
0 m³/s
no overflow
Stored energy
183,031 MWh
reservoir equivalent

Reservoir Level — 30 days

Current 617.6 MASL · 72% of operating band

Spillway Min / Max

Generation Trend

Phoenix Pumped Hydro · 195 MW avg

Generating Units

4 turbine-generator units

UnitTurbineStatusRatedOutputGateRPMEfficiencyBearing °C
Unit 1FrancisRunning200 MW
91.7 MW
62.5%30092.7%59.5°
Unit 2FrancisRunning200 MW
89.6 MW
61.9%30091.8%58.5°
Unit 3FrancisRunning200 MW
90.9 MW
62.3%30091.1%59.7°
Unit 4FrancisStandby200 MW
0 MW
0%00%27.2°