System Online
|60 DERs Connected
21
Not signed in

Thermal Plants — Portfolio

1 thermal plants · 0.27 GW installed across the ACEN portfolio

270MW
Installed capacity
45% of rated
121.5MW
Current output
1/1
Plants online
50%
Avg. capacity factor

Fleet Status

1 thermal plants

1plants
Running00%
Partial1100%
Maintenance00%
Offline00%

Fleet Output

121.5MW
of 270 MW installed — 45.0% utilisation

Plants

1 plants · 270 MW installed · 121.5 MW current output

Click row → plant detail
UnitsCommissioned
South Luzon Thermal (transition)
Batangas
Partial270 MW
121.5 MW
50%22015