System Online
|60 DERs Connected
21
Not signed in
Fleet

South Luzon Thermal (transition)

Calaca, Batangas · 270 MW · commissioned 2015 · ACEN — Thermal (transition)

PARTIAL
Grid Interface
Reactive power
23.4 MVAr
capacitive (voltage support)
Power factor
0.980
meets grid code
Available capacity
270.0 MW
148.5 MW headroom
Dispatch state
Curtailed
55% below capability
Asset Overview
Location
Batangas
Calaca, Batangas
Nameplate
270 MW
Current output
121.5 MW
45% of rated
Capacity factor
50%
Fuel
Coal
32.9 days stock
Heat rate
9,400
kJ/kWh
Thermal efficiency
38.3%
Ramp rate
3.2 MW/min
min load 121.5 MW

Emissions Monitoring

Continuous emissions vs. DENR permit limits

NOx441.6 / 1000 mg/Nm³
44.2% of permit limit
SOx458.2 / 700 mg/Nm³
65.5% of permit limit
Particulate76.6 / 150 mg/Nm³
51.1% of permit limit
115.4 t/h
CO₂ emission rate
950 kg/MWh
CO₂ intensity

Generation Trend

South Luzon Thermal (transition) · 136 MW avg

Generating Units

2 boiler-turbine-generator units

UnitStatusRatedOutputSteam °CPressureSteam FlowEfficiency
Unit 1Running135 MW
124.7 MW
544.1°171.1 bar386.6 t/h42.9%
Unit 2Standby135 MW
0 MW
133.4°3 bar0 t/h0%