Fleet
South Luzon Thermal (transition)
Calaca, Batangas · 270 MW · commissioned 2015 · ACEN — Thermal (transition)
PARTIAL
Grid Interface
Reactive power
23.4 MVAr
capacitive (voltage support)
Power factor
0.980
meets grid code
Available capacity
270.0 MW
148.5 MW headroom
Dispatch state
Curtailed
55% below capability
Asset Overview
Location
Batangas
Calaca, Batangas
Nameplate
270 MW
Current output
121.5 MW
45% of rated
Capacity factor
50%
Fuel
Coal
32.9 days stock
Heat rate
9,400
kJ/kWh
Thermal efficiency
38.3%
Ramp rate
3.2 MW/min
min load 121.5 MW
Emissions Monitoring
Continuous emissions vs. DENR permit limits
NOx441.6 / 1000 mg/Nm³
44.2% of permit limit
SOx458.2 / 700 mg/Nm³
65.5% of permit limit
Particulate76.6 / 150 mg/Nm³
51.1% of permit limit
115.4 t/h
CO₂ emission rate
950 kg/MWh
CO₂ intensity
Generation Trend
South Luzon Thermal (transition) · 136 MW avg
Generating Units
2 boiler-turbine-generator units
| Unit | Status | Rated | Output | Steam °C | Pressure | Steam Flow | Efficiency |
|---|---|---|---|---|---|---|---|
| Unit 1 | Running | 135 MW | 124.7 MW | 544.1° | 171.1 bar | 386.6 t/h | 42.9% |
| Unit 2 | Standby | 135 MW | 0 MW | 133.4° | 3 bar | 0 t/h | 0% |